Abstract

Challenges associated with incorporating the technical potential of photovoltaic (PV) power generation into an existing university microgrid system are investigated with the goal of achieving complete decarbonization. Three energy storage integration pathways are established: sending excess solar PV electricity to 1) battery energy storage systems (BESS) for daily energy shifting, 2) an electrolyzer to produce hydrogen for conversion in a gas turbine power plant (P2G-GT), and 3) an electrolyzer to produce hydrogen for conversion in a fuel cell system (P2G-FC). Installing the maximum geospatially limited amount of solar PV results in directly meeting 20% of the electric load. 58% of PV electric production is curtailed unless energy storage is implemented. The P2G-FC and BESS strategies result in similarly high 64% renewable energy supply (RES) despite having different roundtrip efficiencies. BESS are found to be better than hydrogen storage and fuel cell systems for continuous run times of a day or less. Somewhere between one to three days of continuous power, the hydrogen storage plus fuel cell option is better. To fully decarbonize the microgrid, a significant portion of the RES percentage must come from procured biogas, or from an off-campus resource.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.