Abstract

Geometallurgy integrates aspects of geology, metallurgy, and mine planning in order to improve decision making in mining schedules. A geometallurgical model is a 3D space that is typically synthesized from early-stage small-scale samples and is composed of several metallurgical units, or domains. This work explores the synthesis of a geometallurgical model for a copper deposit using a purely data-driven unsupervised approach. To this end, a dataset of 1112 drill samples is used, which are clustered using different methods, namely, k-means, hierarchical clustering (AGG), self-organizing maps (SOM), and DBSCAN. Two cluster validity indices (Silhouette and Calinski–Harabasz) are used to select the final model. To validate the potential of the proposed approach, a simulated economic evaluation is conducted. Results demonstrate that k-means exhibits a better performance in terms of modeling and that using the obtained geometallurgical model for mining scheduling increases the project’s Net Present Value (NPV) by as much as 4%. Based on these results, the proposed methodology is an appealing alternative for generating geometallurgical models within greenfield, brownfield and ongoing operations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.