Abstract

In systems with many components that are required to be constantly active, such as refineries, predicting the components that will break in a time interval after a stoppage may significantly increase their reliability. However, predicting the set of components to be repaired is a challenging task, especially when several conditions (e.g. breakage probability, repair time and cost) have to be considered simultaneously. A data-driven predictive maintenance policy is proposed for maximizing the system reliability and minimizing the maximum repair time, considering both budget and human resources constraints. Therefore, a data-driven algorithm is designed for extracting component breakage probabilities. Then, two bi-objective optimization approaches are proposed for determining the set of components to repair. The former is based on the formulation of a bi-objective mixed integer linear programming model solved through the AUGMEnted ε-CONstraint (AUGMECON) method. The latter implements a bi-objective large neighbourhood search, outperforming the first approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.