Abstract
<p> The new Bridge over the Danube is part of the Paneuropean Corridor IV that joins Turkey with Germany. The main feature of this new bridge is that both traffics, railway and highway, cross the Danube River between Vidin (Bulgaria) and Calafat (Rumania), throughout one single bridge.</p><p> It is a precast segmental bridge. The Main Bridge can be divided in two parts: there is a continuous extradosed structure in the navigable channel, with maximum span 180 m long and, in the non navigable channel, there is a continuous bridge with 80 m spans long.</p><p> The Main Bridge is 31.35 m wide. The cross section is a single box girder 4.50 m deep.</p><p> The segmental balanced cantilever construction method has been chosen. The precast segments were assembled with a launching girder in the non navigable channel and with a trolley crane in the navigable channel.</p>
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.