Abstract

<p> This paper presents details of the seismic design of the main bridges for the Segundo Cruce del Lago de Maracaibo (Puente Nigale) fixed-link project. The link is 12 km long from shore to shore, and consists of east and west approach bridges and a main cable-stayed bridge over the navigation channel. The link accommodates two parallel bridge structures, one for road traffic and one for rail service.</p><p> The main bridges consists of two parallel cable stayed bridges with main spans of 430 m and is situated in a seismically active area characterized by a peak ground acceleration of about 0.27g for a 1000 year return period event.</p><p> The paper discusses the seismicity in the project area, the development of the seismic design loads, the seismic design criteria, the seismic design strategy and the seismic design of the structure. In particular, the deep pile foundations on soft soil presented unique challenges to the seismic design.</p>

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.