Abstract

Aggressive capacity ramp rate of a semiconductor wafer fabrication is vital for the commercial success of the enterprise. Basic requirements are short and stable production cycle times to timely qualify equipment and to provide acceptable yield. Therefore, in the ramp-up environment which is characterized by high variability and uncertainty, an adequate methodology is required to properly manage the conflict of short cycle times and fast throughput increase. This paper presents a methodology to manage cycle time by closely monitoring and limiting the work in process (WIP), by means of the so-called “WIP caps”. Used consequently, this methodology allows the ramp rate to accelerate as soon as the factory performance enables this while keeping cycle times under control.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.