Abstract

In the world of construction, waste is one of the factors that must be minimized or eliminated, because it can cause cost losses and time delays in the implementation of a construction project. Lean production concept approach using Value Stream Mapping (VSM) tools is a method that can be used to minimize waste that can be seen through value-added activities, non-value added but necessary. The scope of work that has a significant impact on the UBS Surabaya office building construction project consists of ironwork, concrete work, and formwork work on the superstructure, during the period from March to May 2021. In the scope of work identified Value Added amounting to 73 activities (61.34%), and Non-Value Added but Necessary totaling 26 activities (21.85%). There are several types of waste that occur during the implementation process,

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.