Abstract

In order to carry out the long pulse and high power neutral beam injector (NBI) heating experiment on the HL-2M tokamak and satisfy its high vacuum pumping speed in the NBI, two built-in cryopumps with large area and based on a three-stage adsorption structure have been developed. The design idea and size of the three stage structure, the manufacturing technique, and the test experiment for cryopumps have been described in this paper. The experimental result shows that the cooldown time of liquid nitrogen pipes and liquid helium pipes are 1.5 h and 10 min, respectively. With activated charcoal bonded on the condensation plates, the pumping speed reaches 1.13 × 106 l/s, and the consumption of liquid helium is 2.53 g/s and 3.11 g/s for the 4-component pump and the 5-component pump, respectively. The conductance probability of the pump inlet is 0.25 for hydrogen.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.