Abstract

An optimal offline scheduling of the cruise control of heavy haul trains is introduced. The objective of the scheduling is to minimize the in-train forces, which are the most important for the safety driving and maintenance cost of excessively long trains. The constraints of throttling and braking are taken into consideration. With the gradual progresses of implementing electronically controlled pneumatic (ECP) braking systems in practice, three control strategies are proposed. Simulation results of these strategies on different types of trains are given. The ECP braking systems demonstrate superb performance compared with pneumatic braking systems.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.