Abstract

In order to improve the optimization level of regional power grid ancillary services, a cross-provincial and cross-regional optimization mechanism for power ancillary services is proposed, taking the southern regional power grid as a representative. The construction and development of typical regional power grids at home and abroad are analyzed, and the characteristics of the construction and development process of the southern regional power grid in the cross-province and cross-region scheme are explained. The direction of regional auxiliary service optimization is proposed, and the connection of electric power and electricity at the current stage is analyzed, an optimized operation model is established, proposing an auxiliary service centered on the regional power grid, with the goal of optimizing the connection and operation system, and combined with specific project pilots, an application analysis is carried out.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call