Abstract

Even though the design-build (DB) delivery method has become a popular construction project delivery method in many countries, it is relatively rare in Taiwan. This study investigates the problems and difficulties that Taiwanese owners may encounter during using DB delivery methods. Twenty six problems over the four key stages of the DB process were first identified based on previous studies and expert interviews. A questionnaire survey was then conducted to determine the most pressing problems for Taiwan. The results of statistical analyses show that Taiwanese owners face key problems at all stages of the DB delivery method, especially during the tender preparation and valuation stages. These findings can be used by Taiwanese owners for successfully executing DB projects.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call