Abstract
The widespread blackouts of 2003 have exposed the critical role of ICT systems in maintaining reliable operation of power systems. Fundamental errors in providing back-up and alarm function in the control room were one of the main contributing factors to the 2003 USA/Canada blackout. The lack of proper ICT infrastructure to enable proper communication and cooperation between system operators in Italy and Switzerland led to delayed remedial actions and the consequent blackout of Italy in 2003. Improved ICT systems would enable a better real-time cooperation and coordination between utilities in an interconnected power system but the main challenge is political: overcoming resistance of individual utilities to give up partially their interdependence and operate within the paradigm of a distributed, but coordinated, control. Emergence of GPS-synchronised Wide Area Measurement Systems (WAMS) holds a great promise for improved monitoring and control of modern power systems and therefore avoiding future blackouts.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.