Abstract

Material reuse/recycle has gained much attention in recent years for both economic and environmental reasons. Process integration techniques for water network synthesis have evolved rapidly in the past decade. With in-plant water reuse/recycle, fresh water and wastewater flowrates are reduced simultaneously. In this work, linear programming and mixed integer linear programming models that include piping cost and process constraints are developed to retrofit an existing water network in a paper mill that was not originally designed with process integration techniques. Five scenarios are presented, each representing different aspects of decision-making in real process integration projects. The fifth scenario makes use of fuzzy optimisation to achieve a compromise solution that considers the inherent conflict between maximising water recovery and minimising capital cost for retrofit.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.