Abstract

AbstractRing line no.15 is one of four new metro lines of the Grand Paris Express mega‐project. The construction lot T2C in the southeast of Paris with a length of approx. 7 km is a key part of the new line. It consists of a 4.7 km long tunnel between Noisy‐Champs and Champigny, a 2.2 km long bypass tunnel with a maintenance station, a large‐scale underground junction cavern, and intermediate access shafts. Difficult ground conditions, limited space for construction, and the requirement for minimization of settlements in an urban environment determine the ground control systems for this tunnel project. Among others, the AT – 139 pipe umbrella system with press connection and a wall thickness of 8 mm, foot piles from the DSI hollow bar system as well as GRP face anchors were used. (photo: DSI Underground)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.