Abstract

The performance analysis of double shield TBMs in difficult ground conditions in the Gerede tunnel is presented in this study. The strength of the encountered formations along the tunnel route varied from medium strength (sandstone, limestone) to high strength (basalt). The total length of tunnels is 31.6 km, which was excavated by three double shield TBMs having diameter of 5.57 m. Literature studies are first carried out in order to review the difficult ground conditions and their impacts on mechanized tunnelling. Later, the project, geology, and the characteristics of the TBMs are given in detail. Then the factors affecting the performance of the TBMs, machine utilization, and operational parameters (torque, thrust) are discussed in detail. In the light of these facts, the main objective of this study is to describe the possible improvement methods to reduce the effect of these difficulties on TBM performance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.