Abstract

AbstractThe 27 km long second track between Divaca and Koper is one of Slovenia's most important infrastructure projects and includes seven tunnels with a total length of approx. 20.5 km. For tunnel T7 – Mlinarji above the Ospska valley in Črni Kal, DSI Underground supplies all ground support equipment. (photo: DSI Underground)

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call