Abstract

AbstractThe 27 km long second track between Divača and Koper is one of Slovenia's most important infrastructure projects and includes eight tunnels with a total length of approx. 20.5 km. At the portal of the service tunnel in Mlinarji, slopes and embankments needed reinforcement. To do that, DSI Underground supplied galvanized DSI Hollow Bar Anchors R32‐280 and R32‐400 in lengths of 6, 9, and 12 m. (photo: DSI Underground)

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call