Abstract

AbstractThe Pflaurenz Tunnel, which is roughly 1 km long, is being built to provide a bypass which relieves pressure on the St. Lorenzen municipality in South Tirol. Half of the tunnel (approx. 417 m) passes through loose rock and was driven by excavators. To provide advance support, the innovative AT – Pipe Umbrella System with 139 [mm] squeezed connection developed by DSI Underground was successfully used in the loose rock sections of the Pflaurenz Tunnel to quickly and safely connect the tubes when driving the tunnel. (photo DSI Underground)

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.