Abstract

AbstractFor over 25 years, the AT Pipe Umbrella System has been used to cope a wide variety of challenges such as fractured rock, fault zones, loose rock, slope debris areas or backfill, thus enabling safe and efficient tunnelling. The first application in 1998 in the Sieberg Tunnel – a 6.48 km long tunnel on the Vienna‐Salzburg high‐speed railway line – was a complete success and the starting point for a long‐lasting success story. (Source: DSI Underground)

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.