Abstract
Engineering. Procurement. and Construction projects (EPC) were involved with many people and used a lot of resources faced a lot of uncertaintly and risk which were happened would be impact the performance of the project.Cost is a resource that plays an important role in supporting a project construction. Cost planning can be done through a costs scheduling in order to obtain the required amount of cost based on the time of project implementation. This study aims to assess the cost performance of the Substation and Transmission lines 150 kV EPC project in Banten Province. The study methodology includes identifying cost performance indicators derived from various issues by means of literature studies and portrait studies of substation and transmission lines 150 kV EPC projects in Banten Province. This research is expected to be able to provide a picture of the cost performance that is part of the Management Cost and Control System (MCCS) both in the planning process and during implementation. In the end, this study is expected to be able to provide positive recommendations for the contractor to produce the project with the best project funding. The impact of this study, will also provide a positive thing for the smooth running of the EPC Project, especially the construction of the Substation and Transmission lines 150 kV.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Materials Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.