Abstract
We study the effect on cost overruns of two different auction formats, the first price sealed bid and the average bid, conditional on whether entry is open or restricted. The first price format awards the contract to the lowest bid, while the average bid format awards the contract to the bid closest to the average of all the bids. This latter format is supposed to prevent an unreliable low bidder from winning the auction; as a consequence cost overruns should be lower under the average bid than under the first price format. We test this hypothesis with a panel data set of auctions held in the Italian Veneto region between 2004 and 2006, including small size public projects in sectors such as road works and building maintenance. We find that cost overruns are lower under the average bid format, but only when the entry is restricted. We then speculate on possible explanations for this result.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.