Abstract

This paper investigated cost estimation methods and continuous improvement in terms of project management planning, as well as the factors that influenced these actions. Estimating the cost was one of the most imperative tasks to be done by the managers for a project. Key factors, such as cost, size, schedule, quality, people resources, maintenance costs, and complexity, were usually estimated in the beginning of project development. The techniques used for cost estimation included data composed from past projects that were combined with mathematical formulae to get the closest estimation. In regards to continuous improvement, the four-step quality model (PDCA cycle) was used as an ongoing effort to improve products or services. PDCA stands for plan, do, check, and act, which were the steps to successfully implement change. Notably, project management, when tasked with cost estimation and continuous improvement, was challenged to cope with evolving and situational alterations, which required a different set of skills.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.