Abstract

This paper elaborates on the costs and benefits of expanding the Austrian transmission system and the implementation of innovative grid-impacting technologies (e.g. flexible AC transmission systems (FACTS), dynamic line rating (DLR)) to support further integration of renewable energy sources for electricity generation (RES-E). Therefore, a fundamental market model has been developed - respecting DC load flows - and applied for analysing different future scenarios, notably for the time horizon 2020, 2030 and 2050. Up to 2020 and 2030, special focus is put on the finalisation of the so-called “380 kV-level transmission ring” in Austria to enable enhanced RES-E integration. The results confirm that transmission power line expansion in the states of Salzburg and Carinthia is important to connect imports from Germany with pumped hydro storage capacities, on the one hand, and the wind farms in the east with the pumped hydro storages in the western part of Austria, on the other hand. For 2050, the results indicate that the implementation of FACTS and DLR can reduce RES-E curtailment significantly.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.