Abstract

The US Department of Energy is actively seeking ways in which to delay or obviate the need for additional nuclear waste repositories beyond Yucca Mountain. All of the realistic approaches require the reprocessing of spent nuclear fuel. However, the US currently lacks the infrastructure to do this and the costs of building and operating the required facilities are poorly established. Recent studies have also suggested that there is a financial advantage to delaying the deployment of such facilities. We consider a system of government owned reprocessing plants, each with a 40 year service life, that would reprocess spent nuclear fuel generated between 2010 and 2100. Using published data for the component costs, and a social discount rate appropriate for intergenerational analyses, we establish the unit cost for reprocessing and show that it increases slightly if deployment of infrastructure is delayed by a decade. The analysis indicates that achieving higher spent fuel discharge burnup is the most important pathway to reducing the overall cost of reprocessing. The analysis also suggests that a nuclear power production fee would be a way for the US government to recover the costs in a manner that is relatively insensitive to discount and nuclear power growth rates.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.