Abstract

Corrigendum on: Jiang N, Su F, Li Y, Guo X, Zhang J and Liu X (2021) Debris Flow Assessment in the Gaizi-Bulunkou Section of Karakoram Highway. Front. Earth Sci. 9:660579. doi: 10.3389/feart.2021.660579In the published article, there was an error in affiliation **2**. Instead of "** Institute of Mountain Hazards and Environment, University of Chinese Academy of Sciences, Beijing, China **", it should be "** University of Chinese Academy of Sciences, Beijing, China **". The authors apologize for this error and state that this does not change the scientific conclusions of the article in any way. The original article has been updated.In the published article, there was an error in Keywords. Instead of "** Karakoran highway **", it should be "** Karakoram highway **". The authors apologize for this error and state

Highlights

  • In the published article, there was an error in affiliation 2

  • Specialty section: This article was submitted to Geohazards and Georisks, a section of the journal

  • There was an error in affiliation 2

Read more

Summary

Introduction

There was an error in affiliation 2. Corrigendum: Debris Flow Assessment in the Gaizi-Bulunkou Section of Karakoram Highway Approved by: Frontiers in Earth Science Editorial

Results
Conclusion
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call