Abstract

The airport powersystem has the same elements as the Indonesia Electricity Company (PLN) system, which is consists of generation, transmission and distribution. The main power source not only supplied by PLN, but also can be obtained from the generator set. High reliability of power systems is needed to supply vital equipment and essential facilities, such as runway lights, telecommunication system in control tower, data processing computer, radar navigation system and other facilities. To be able to provide reliable service, the power system must remain intact and able to overcome various kinds of faults that may occur. Therefore, the coordination of the protection system has important role in maintaining the continuity and reliability of the power system. In this study, overcurrent relay and ground fault relay were used. The result was revealed by graphical images in the form of a current-time curve. This study suggested the coordination arrangement of over current relay at Samarinda Airport to estabalish more reliable current relay coordination.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.