Abstract

We consider an assembly system that adopts both overseas sourcing and local sourcing for different components. Local sourcing has a short and deterministic lead-time. Overseas sourcing can be divided into two stages and each stage has uncertain transportation duration. A capacitated expediting service could be adopted after first-stage transportation. In this study, we derive an optimal expediting policy for overseas sourcing and an optimal responsive sourcing policy for local sourcing. In addition, we discuss the impacts of lead-time volatility and the decision of safety lead-time, which are relevant in implementing the expediting service.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.