Abstract

In this paper optimal and near optimal policies are proposed for multi-echelon production/inventory assembly systems under continuous review with constant demand over an infinite planning horizon. Costs at each stage consist of a fixed charge per order or production setup plus a linear holding cost on “echelon” inventory. The objective is minimization of average cost per unit time. The major results of this paper are: a mathematically simple, often optimal, “system myopic” solution, a lower bound on the closeness to optimality of this solution, and a branch and bound algorithm which usually finds the optimal solution quickly.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.