Abstract

A control survey technique using a laser tracker and a digital level was introduced to the KEK e-/e+ injector linac in 2020. Control surveys are continuously demonstrated during the machine's downtimes every summer. Analysis of the two-year data reproduces their trends in terms of the fiducial points on the beam line. In our paper, we report on systematic coordinates and their error distributions evaluated by a control survey, compare them with a numerical survey simulation, and discuss newly encountered issues.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.