Abstract

Geometric control of bridges erected using the balanced cantilever method is always complex. In this case, this has been compounded by the great structural flexibility, weight, and dimensions of the erected segments and the cable-stayed cross-section scheme.These uncertainties, added to the process of obtaining the geometry of the tower and deck, can be fully adjusted if an exhaustive control of all bridge elements is performed throughout the entire construction sequence.The rationale was based on the detailed prior segment assembling in the dockyard, and its positioning using an angle relative to the previously erected deck, establishing some adjustments to eliminate the calculated deviations. A special procedure was established for the geometric control of the joints between different decks in order to adjust precisions to welding tolerances.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.