Abstract

Discussions on the best way forward to achieve reductions in journey time without the investment normally associated with the construction of new high-speed railways tend to concentrate on the technical issues to be resolved rather than on the very significant operational, legal and human issues that affect the economies of any high-speed railway operation. Many engineers and operators associated with long-established railway systems (1-4) view the introduction of tilting trains as the best way forward in situations where speed limits are imposed by track built with the objective of minimizing expenditure on civil works. Although there are instances where the introduction of tilting trains has yielded the benefits sought, there are many situations where the environment of the railway business effectively excludes this option. The author of the present paper has attempted to review the tilt debate from an operations angle, stimulated by some comments by Meyer (5), and focuses on developments in Great Britain.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.