Abstract
The project in this paper is a “ district twinning” project of Suzhou polytechnic institute of Agriculture. In the paper, the author analyzes the sheds of pig cleanup job needs for farm in Yuping Mountain Ecological Park in Suzhou, and designs a new cleaning device and its appropriate electrical control systems without changing the traditional captive facilities. The paper first analyzes the Control Analysis Based on the Operation of Automatic Captive Cleaning Equipment.Finally, the actual installation and debugging is explained, a brief description of several common problems, solutions and matters needing attention are given. The practice proves that the whole electrical control system is practical and reliable, and the desired effect is achieved.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.