Abstract
This study presents a novel approach for the contingency constrained phasor measurement units (PMUs) placement. The proposed approach is based on n − k redundancy criterion using robust optimisation. This security criterion ensures observability of the network under any contingency state, containing the loss of up to k PMUs. In the proposed method, the effects of zero injection and power flow measurements as well as possible contingency states (such as branch outage and single or multiple PMU loss) are considered. The non-linear modelling of observability function for measurements is reformulated by linearisation process. The resulting bi-level programming model is solved by its evolution to an equivalent single-level mixed-integer programming problem. The objective function of the optimal PMU placement is aimed at minimising the number of PMUs in a way that guarantees economic goals and the observability of all network buses. The advantage of this model is to significantly reduce the computational burden compared with other methods. The proposed method is tested on modified 7-bus test network, 118- and 2383-bus IEEE test networks. The results of the case studies clearly demonstrate the simplicity and efficiency of the proposed robust optimisation method in different cases.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.