Abstract

Electric power transmission system must operate reliably and continuously, but in fact there are many disturbance that affect the reliability and stability of the power system. This study aims to determine the weak elements of power system when release of components occur. This study uses simulation with Newton Raphson power flow method for contingency analysis. The study is located in South Bandung electric power system with voltage of 150 kV. In this study, the object of contingency analysis is IBT-II 500/150 KV at peak periods load in 2013 to evaluate the system reliability when release of the Inter bus Transformer (IBT). Selection of the component is based that IBT is the most important component in the power supply that should be maintain continuously. The results of the study and analysis show that in the event of contingency almost all bus voltage has decreased below the limit allowable voltage and IBT-I get overloaded, then the maneuver is performed according to the procedures of specified load. The results of this study can be use as a reference for the electric power operating system which has conditions similar to the simulated cases.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call