Abstract

Extant literature has confirmed the unavoidability of changes to the design of construction projects. These changes have also been identified as major reasons for project cost, quality, and time failure. Despite BIM’s documented capabilities to enhance project success, its implementation remains unsatisfactory in Nigeria. This paper, therefore, examines the impacts of BIM-based design workflow in consulting business on construction project design performance. Using questionnaire as the research instrument, quantitative survey research was adopted to collect data from consulting organizations. Analysis revealed sequential and concurrent workflows as the most used and preferred, respectively. Design coordination, information, and communication are enhanced with sequential workflow within a firm, while concurrent metrics are enhanced when collaborating with other firms. Both workflows are jointly declared suitable for the timely delivery of designs. The study, therefore, recommended retraining of professionals on sequential and concurrent workflows because of their appropriateness for efficient design within and among firms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.