Abstract
Taking the foundation pit construction of the section K0 + 700 ~ + 900 of Shuangjiehe Road, Tinghai Road and other underground roads in Qianhai District of Shenzhen as an example, this paper introduces a new key construction technology of deep and large foundation pit excavation in the coastal area of reclamation to control the uplift and deformation of underground subway, which effectively utilizes the principle of space–time effect. Based on the number of finite difference software FLAC 3D numerical analysis, the skip excavation method and key construction parameters are simulated and optimized. The monitoring data show that the excavation method, sequence and construction protection measures have significant effect on the deformation control of subway tunnel, which can provide reference for similar projects.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.