Abstract

Deep foundation pit excavation not only faces complex hydro-geological and engineering geological conditions, but also meets many unknown engineering risks. Deep foundation pit excavation not only faces complex hydro-geological and engineering geological conditions, but also needs to make full use of BP nerve network. Based on this, this paper first analyzes the connotation and function of BP nerve network, then studies the simulation of deep foundation pit construction earthwork excavation, and finally gives the BP nerve network simulation and optimization method of deep foundation pit construction earthwork excavation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.