Abstract
Based on the large-span spatial structure of Ordos's airport terminal of the extension project, a set of construction process and key technology for large-span spatial steel structure was discussed in detail, including elementary assembly on ground, segmental hoisting, overhead unit connection and curvilinear accumulated sliding. A set of multi-stage construction analysis method was put forward. Through FEM numerical simulation and analysis of the whole erection process, the construction sequence was adjusted and the pre-deformation was set, and a satisfactory practical outcome was achieved consequently.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.