Abstract

PurposeAirports are booming in China, to enlarge their capacities and stimulate economic development. Large-span spatial steel structures are commonly used in the terminal buildings of airport projects. Their advantages include prefabrication, strength, usability, adaptability and aesthetic quality. To manage large-span spatial steel structure projects, building information modeling (BIM) is recommended. Although there are plenty of studies on BIM application in steel structure projects, it is still rare to apply BIM to optimize the schedule and cost of steel structures, especially for airport projects.Design/methodology/approachThis paper aims to develop a framework in which BIM and a time-cost optimization model are integrated to optimize construction costs and the duration of large-span spatial steel structure projects. A real case study was conducted to verify the feasibility of the BIM-based time-cost optimization model in an airport terminal building, which was built with a large-span spatial steel structure.FindingsThe results preliminarily support the reliability of the proposed BIM-based time-cost optimization model. The BIM-based time-cost optimization model will benefit construction planning for professionals and enrich relevant research on the application of BIM in large-span spatial steel structure projects.Originality/valueThe steel structure is difficult to control budgets and progress. This paper is expected to be adopted for optimizing the time and cost plans for projects involving steel structures in airport terminal buildings.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call