Abstract
Baixugong tunnel is a big karst tunnel in Qing-Lian highway, and the construction environment is complexity. The structure of pile-pile cap-supporting wall-connection beam is used to treat the karst cave tunnel. Using simulation results and monitoring data to reveal the influence of tunnel excavation to treatment structure. The treatment structure in the karst tunnel is safe and reliable. The supporting wall stress and pile strain all increase accelerating during the advance of excavation face, then stabilize gradually. The construction simulation results are similar with the monitoring data, which demonstrates the important role of treatment structure in the karst tunnel.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.