Abstract
INTRODUCTION: The medium voltage overhead distribution network is a complex planning problem, and monitoring the construction progress of the medium voltage overhead distribution network is an important aspect of the planning problem. Regarding the structure of the medium voltage overhead distribution network, it is one of the important components in China's distribution network system. If the construction progress of the medium voltage overhead distribution network is optimized, it will affect the normal operation of the entire power grid system in a certain region. Optimizing the construction progress of medium voltage overhead distribution networks using modern development related technologies or algorithms is one of the practical research topics. OBJECTIVES: To better predict various issues that may arise during the construction progress of the distribution network. Complex geographical conditions lead to construction difficulties, and lack of technology leads to frequent stoppages of construction, further leading to frequent power outages in various regions. In terms of the overall power supply system, the reliability of power supply is not high. METHODS: By comparing the BP neural network algorithm with the CNN network algorithm, the actual operation effect is evaluated by experts. RESULTS: This article predicts the implementation progress of the medium voltage overhead distribution network, and the results show that the accuracy of the BP model for predicting the construction progress of the medium voltage overhead distribution network can reach 88%; The accuracy of the CNN medium voltage overhead distribution network construction progress prediction model reaches 77%. CONCLUSION: The use of neural network algorithms to optimize the construction schedule of medium voltage overhead distribution networks has been evaluated by experts in practical applications, and the medium voltage overhead distribution network in power supply systems has potential application value.
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have