Abstract
As an important task of construction project management, construction schedule management is related to the realization of project period, cost, quality, and other objectives. However, in actual construction, problems such as difficulties in plan implementation and management are often encountered, and schedule delays often occur. Moreover, with the increase in the scale and complexity of modern buildings, the management of construction schedules has brought about larger issues and higher requirements have been put forward for the management level of the construction schedule. The traditional timetable management and scheduling is not highly relevant to the project entity. There is no entity change, the project information loss is serious, the tracking and control of the construction timetable is not in place, there is fine management, and the construction timetable management cannot meet the needs of modern construction. In order to ensure the smooth implementation of projects and objectives, it is urgent to explore new management ideas and methods to promote the smooth progress of construction process management. BIM technology has the advantages of visibility, simulation, adjustment, optimization, and advanced data integration, which helps to make up for the shortcomings of previous schedule management and improve the level of construction schedule management. Based on the research situation of large-scale construction project monitoring system and the analysis of information fusion technology, this paper proposes a large-scale construction project monitoring system scheme based on multisensor network information fusion. Through the investigation of the monitoring content, the composition of the multisensor network is determined. This paper is applicable to large-scale construction projects. Through the research and design of hardware modules, software modules, and fusion algorithms, the data acquisition, transmission, calculation, and display functions of the monitoring system based on multisensor network information fusion are realized, which can effectively monitor the entire process of large-scale construction projects.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.