Abstract

The traditional construction structure construction quality management method ignores the mutual influence of various factors, divides the construction period into relatively independent links, and conducts quality management separately, resulting in poor management effectiveness of the traditional management method. In order to solve the above problems and improve the feasibility of the quality management method, the green construction engineering structure quality management method based on the BIM model is studied. Analyze the factors that affect the construction quality in the green building construction project, and determine the correlation between the factors. Use the BIM model to improve the three-dimensional spatial information of the building, and combine the PDCA quality management system to achieve the management of the construction quality of the project. The experimental results show that, compared with the traditional construction quality management method, the quality management method based on BIM model is more feasible and effective.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.