Abstract
Construction monitoring is a system, especially for long-span pre-stressed concrete continuous rigid frame bridge. Based on the construction control of the right bridge Ju-ma River NO.3 Bridge, this paper has made comprehensive conclusion and detailed discussion in the aspects of construction control method, the basic process of construction control, and bridge construction control survey methods. The findings described herein will provide considerable reference for the construction control of other similar long-span bridges.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have