Abstract

Implementing monitoring over construction process of old bridge’s reinforcement serves as an important measure to ensure construction quality and safety and realize the goal of reinforcement. This paper, with a case study of the maintenance and reinforcement project of Zhicheng Yangtze River Bridge (steel truss highway-railway combined bridge), adopted MIDAS to establish finite element analysis model, and with stress and deformation as monitoring parameters, completed the construction monitoring work, numerical simulation analysis and site test for the reinforcement project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call