Abstract
Aiming at the flight safety problems existing in UAV power patrol inspection, this study proposes a UAV patrol inspection safety management system (SMS) scheme, which takes the safety target level specified in soar as the target management, based on safety management, modern control theory, risk management, and UAV operation regulations, combined with the actual needs of machine patrol inspection of China Southern Power Grid and the requirements of local government. The UAV SMS scheme is developed from four parts: safety policy, risk management, safety guarantee, and safety promotion, and the application analysis is carried out in combination with the Kobe accident case in 2020. The experimental results demonstrate that the implementation of SMS scheme can effectively reduce the accident risk level during UAV power patrol inspection.
Highlights
In 2016, the National Development and Reform Commission issued the “National Electric Power” 13th “Development Plan” that proposed the power development goals from 2016 to 2020. e size of the grid would continue to grow, and the special high pressure grid would be further mature, as of the end of 2017. e total mileage of 35 kV and above the overhead transmission line reached 18.3 million, nearly increasing 40% from 2015. e size of the grid ranks first in the world
Wen-Kuei Lee developed a quantitative model for the evaluation of aviation safety risk factors, and it is a method of increasing the effectiveness of the safety risk management system by integrating the fuzzy linguistic scale method, failure mode, effects and criticality analysis principle, and as low as reasonably practicable approach [1]
Steffen Kaspers’ respective data from 7 European airlines were analyzed to explore whether there is a monotonic relationship between safety outcome metrics and safety management system (SMS) processes, and operational activity and demographic data were widely used by the industry
Summary
In 2016, the National Development and Reform Commission issued the “National Electric Power” 13th “Development Plan” that proposed the power development goals from 2016 to 2020. e size of the grid would continue to grow, and the special high pressure grid would be further mature, as of the end of 2017. e total mileage of 35 kV and above the overhead transmission line reached 18.3 million, nearly increasing 40% from 2015. e size of the grid ranks first in the world. Safety assurance feedback to risk management feedback from the new risk source and the risk management are evaluated and analyzed It acts on security promotion and profile acts on security guarantees, correcting poor run safety status, so that the operating security state is always in an acceptable range. By deeply understanding the characteristics of the machine, combined with the PDCA cycle theory, modern control theory refers to the requirements of the public air carrier and the requirements of the International Civil Aviation Organization “Safety Management manual.” is study works the SMS content that is divided into four modules: security policies, risk management, security assurance, and security promotion.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.