Abstract

The service restoration application for severe power outages involving the consideration of the healthy medium voltage (MV) busbar feeders of the HV/MV substation in de-energised area is presented in this paper. The MV busbar feeders consideration is achieved by introducing additional coefficient to the heuristic graph-based service restoration algorithm. Minimisation of unsupplied load is the primary objective of the proposed service restoration application. Secondary objective is the reduction of the number of switching actions. The proposed approach involves the assignment of the weighting coefficients de-energised distribution network branches. The consideration of the healthy MV busbars feeders significantly improves the service restoration algorithm performance.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.