Abstract

This paper discusses the consequences competitive bidding have on lead time in project-based production, such as construction. Earlier studies argued that competitive bidding may significantly increase resource consumption and generate waste in the delivery process, which this paper supports. However, the relation between competitive bidding and lead time has been less discussed. Lead time reduction has long been considered a fundamental objective for overall business improvement. An objective of our study was to understand what contributes to long lead times. The reported findings are from a 4-year study on the delivery process of power distribution equipment, a type of engineered-to-order (ETO) product. The paper concludes by suggesting procurement practices that reduce lead times for ETO products.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.