Abstract

In order to further enhance the active power regulation capacity of China power grid, this paper analyzes the necessity of constructing accident reserve capacity of power grid under the new power system from the aspects of receiving terminal characteristics, new energy development and load fluctuation. In order to further improve the active power regulation ability of my country's power grid, the necessity of constructing the emergency reserve capacity allocation of my country's power grid under the construction of a new power system is analyzed from the aspects of receiving terminal characteristics, new energy development and load fluctuation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call