Abstract
1. Results of full-scale observations of overall displacements of the dam, the behavior of joints between sections, settlements of the rock base, and seepage processes in the dam and its base indicate good technical condition of the structure noted throughout the 20 years of its operation. 2. Indices of the operating structure's condition, on the whole, correspond to design expectations.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have